This guide explains project tutorials workload planning for project supervisors and the academic coordinator. Start by counting requested work and checking the available time. Then use the example and checks below to agree a practical next step with the people who run the schedule.
Project tutorials need a different rhythm from ordinary lessons. One group may need a short planning conversation, while another needs equipment time before a supervisor can review its progress. The same specialist may advise several projects across year groups. Record those commitments separately, using neutral project codes rather than private assessment notes. Then identify which meetings depend on work being ready and which can move within the week. This gives the coordinator a practical basis for allocating scarce specialist time.
It also helps supervisors explain why an apparently empty period cannot always accommodate another project group.
Project Tutorials Workload Planning: worked example
Illustrative planning example. The numbers and timings below explain a possible situation; they are not customer results or required staffing standards.
A sample cohort contains eight projects. Five groups request a 20-minute progress meeting, while three request a 40-minute design review. Their combined meeting demand is 220 group-minutes, but the specialist joins only the design reviews.
List the purpose and required roles for each request. Count specialist time separately from general supervision. Ask each group to confirm what must be ready before accepting its requested review slot.
Check the result: The final request list accounts for all eight groups and identifies which 120 minutes require the specialist, without reserving them for unrelated meetings.
Project Tutorials Workload Planning: setup checklist
| Planning input | What to confirm |
|---|---|
| Project group code | Keep stable group identities across consultation and review. |
| Supervisor role | Distinguish the main supervisor from a visiting specialist. |
| Work-ready date | Record the agreed earliest useful review date. |
| Equipment window | Identify the practical session needed before discussion. |
Count participation and resource time separately
Start with the sessions the school has approved, including their purpose and required attendance. A shared activity can serve several groups in one room. However, the same programme may need extra preparation from a teacher or support colleague. Count those commitments separately. For example, two repeated workshops create two trainer bookings even when each participant attends only one. Keep a request list with stable activity codes so revisions can be checked. Then compare group participation, staff time and resource occupancy. These totals answer different planning questions.
A clear count helps the coordinator explain whether an extra request needs another window, a different format or an approved resource change.
Settle requests before filling the timetable
A large request list often contains preferences as well as agreed requirements. Ask each organiser to confirm the sessions their programme actually needs. Then identify requests that duplicate another sheet or replace an earlier proposal. Subject heads should decide which delivery changes are acceptable. The scheduling review can show their consequences, but it cannot settle educational priorities by itself. Therefore, keep unresolved requests visible rather than making them disappear from the count. Review the least flexible staff and specialist spaces early.
Finally, compare the draft with the approved list and explain any activity still awaiting a decision before the school releases a working programme.
Questions to ask before choosing software
A useful trial follows a project through preparation, consultation and review. Ask the supervisor to identify the meeting that has the least flexibility, then change its equipment booking. The buying decision should reflect how clearly the team can review that knock-on effect. Confirm whether any sequence check needs a manual review; a calendar entry alone does not establish that project work is ready.
Bring a representative example to your evaluation. Review the current VeloRoster plan and its limits and Try interactive demo → that reflects your team’s people, spaces and timing needs.
Frequently asked questions
What should we avoid when planning project tutorials?
- Giving every project the same tutorial length despite different tasks.
- Booking review before the required practical session.
- Assuming one available teacher can replace every specialist.
Review these points with the activity owner before you approve the plan.
Should one joint activity count once or once per group?
Count the resource booking once when groups share the same activity. Also record each group’s intended participation. Those two views describe different demand. Then check the approved capacity and staffing arrangement for the combined session before treating it as a feasible shared booking.
How should preparation time enter the calculation?
List preparation where it creates a real staff or resource commitment. Use a duration agreed by the activity owner. Then connect that work to the session it supports. This avoids counting only pupil-facing time while leaving essential school duties outside the planning review.
What if the requested sessions do not fit?
Show the unmet requests and the resources causing the restriction. Then ask the responsible school lead to compare acceptable changes in timing, grouping or delivery. Keep the decision explicit. A timetable should not quietly remove an agreed activity to make the remaining grid appear complete.